Global Connect
in 2022-2024 Magtrack was successfully used in a trencher by Baltic Offshore.
They installed 460 km of submarine telecom cables for Global Connect’s Aurora project.
The Magtrack system mounted on Baltic Offshore’s trencher.
in 2022-2024 Magtrack was successfully used in a trencher by Baltic Offshore.
They installed 460 km of submarine telecom cables for Global Connect’s Aurora project.
The Magtrack system mounted on Baltic Offshore’s trencher.