Global Connect

in 2022-2024 Magtrack was successfully used in a trencher by Baltic Offshore.

They installed 460 km of submarine telecom cables for Global Connect’s Aurora project.

The Magtrack system mounted on Baltic Offshore’s trencher.

Previous
Previous

Viking Link

Next
Next

Shallow Water test